Build Configuration 1, 2 & 3 Program Guide
Introducing our Build Configuration Program, designed to support the many project requirements that come your way.

Optic Arts provides a targeted selection of our star products delivered in 3-4 business days to be configured in the field, when time is of the essence and you need to get off the project fast. Or are run lengths confirmed and required to be cut to length before arriving to the job site for field assembly. Have a little more time to wait, and you require cut to length and pre-assembled fixtures to be tailor made to the project?

Specifiers and Contractors can now build out their applications while addressing specific project needs and timelines, while achieving the same performance and design intent every time.
Lead Time: 3-4 Days*

FIELD CONFIGURE*

Reels with Power Feeds for Field Cutting and Termination

BENEFITS

• Completely field configurable using Flex Connect® connector system
• Perfect for applications where run lengths cannot be determined in advance Quick-ship

Download Flex Connect® Install Guide

Lead Time: 2-4 Weeks*

FIELD ASSEMBLE

Cut To Length With Soldered Leads, Assemble On-Site

BENEFITS

• Runs can be field trimmed
• Useful when run lengths are known but may vary slightly
• Short lead time

Lead Time: 6-8 Weeks*

FACTORY ASSEMBLE

Pre-Assembled Factory Finished Fixtures

BENEFITS

• Easy installation
• Shipped as a complete fixture


 

*Field Configure is quick ship if run lengths are provided at time of order. Take offs, if needed, will add lead time.